Orderearly

Supply Chain Clarity from the First Mile

We analyse warehousing workflows, identify transport bottlenecks, and design dispatch schedules that keep your deliveries on time and your operations lean.

Warehouse Slotting

Velocity-based slotting redesign that cut pick-path travel time by 22% for a regional retailer.

Cross-Dock Scheduling

Real-time dock assignment and lane management that reduced dwell time from 8 hours to under 90 minutes.

Early-Stage Distribution

Network design for a hardware startup that achieved 98% on-time delivery from the first shipment.

Ready to streamline your supply chain?

One conversation can identify the bottlenecks costing you time and margin. Let’s map out a practical first step — no pitch decks, just a focused review of your current logistics.

What we deliver

Measurable outcomes from every engagement.

Shorter pick paths

We re-slot warehouses by velocity and order profile. One retailer cut travel time by 22% and freed up 15% floor space — no new equipment needed.

Faster cross-dock turns

By staggering inbound arrivals and pre-assigning staging lanes, we dropped dwell time from 8 hours to under 90 minutes for a perishable goods distributor.

Scalable launch networks

A hardware startup needed distribution before first production. We modelled demand phases and built a two-hub network that hit 98% on-time delivery from day one.

Lower spoilage rates

Redesigned dock scheduling for a fresh-produce client cut spoilage to 0.4% and saved over $1.2M annually in waste and overtime.

Deferred capital spend

Better slotting and flow design let one retailer postpone a planned warehouse expansion by 18 months — freeing budget for other priorities.

First-pass accuracy above 99%

After our slotting redesign, a mid-size retailer hit 99.3% first-pass pick accuracy — fewer errors, fewer returns, faster order cycles.

Trusted by operations teams

Real results from manufacturing and retail supply chains.

98%
On-time delivery

Hardware startup hit target from first shipment.

22%
Pick-path reduction

Mid-size retailer cut labour costs and sped fulfilment.

8h → 90min
Dwell time cut

Fresh-produce distributor slashed spoilage to 0.4%.

“Orderearly’s slotting audit revealed inefficiencies we had overlooked for years. The 22% reduction in pick-path travel time directly improved our labour productivity and order accuracy.”

— Operations Director, Regional Retail Chain

“We were losing inventory to spoilage every week. Their cross-dock scheduling redesign cut dwell time dramatically and saved us over a million dollars annually.”

— Supply Chain Manager, Fresh-Produce Distributor
MIDWEST LOGISTICS ATLAS RETAIL PIONEER HARDWARE FRESHLINE PRODUCE

Related insights

Articles and case studies on supply chain strategy, warehouse operations, and distribution planning.

Warehouse Slotting Optimisation for Mid-Size Retailers

Reducing pick-path travel time by 22%

How we redesigned slotting for a regional retailer to cut labour costs and speed up order fulfilment.

Read more

Cross-Dock Scheduling for Perishable Goods

Cutting dwell time from 8 hours to under 90 minutes

A fresh-produce distributor needed to eliminate bottlenecks at their cross-dock facility.

Read more

Early-Stage Distribution Planning for a Hardware Startup

Building a scalable logistics backbone from day one

How we helped a hardware startup design a distribution network that grew with their product launches.

Read more
Cookie settings

We use cookies to keep the site reliable, remember basic choices, and understand which pages are useful. You can accept, reject, or review the settings before continuing.